CROSS OVER

A cross-over is a common sight in a petrochemical complex. Most refineries, petrochemicals and oil & gas plants have on-grade pipelines running within the plant. And more than often, these pipelines are of diameters in excess of 12″. Crossing these, therefore, can be both difficult and unsafe. A cross-over can range in height from as low as 750mm to as high as a few meters. It can either be designed as a pair of simply supported beams or it may have one or more intermediate supports for economy reasons.

We understand the stringent requirements for an oil & gas project including local regulations, statutory requirements and safety norms, and implement those in a systematic, uncompromising manner. The aim is to minimize the revision cycles until client approval.